5 citations · 5 across the 1 of their papers we have counts for
2 papers
physics.acc-ph2023
Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab
J. Helsper, S. Wallon, D. Passarelli +3
Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were pro…
physics.acc-ph2015★ 5 cited
Compact Low-Voltage, High-Power, Multi-beam Klystron for ILC: Initial Test Results
V. E. Teryaev, S. V. Shchelkunov, S. Yu. Kazakov +6
Initial test results of an L-band multi-beam klystron with parameters relevant for ILC are presented. The chief distinction of this tube from MBKs already developed for ILC is its…