◍wovepaper
SearchResearchersInstitutions
Sign in
researcher

C. Jensen

6 papers hereh-index 10792 citations47 works total

Matching runs newest-first, so older work may not be attached to this profile yet.

author position
  • middle author5

Across the 5 of 6 papers where every author was matched, so the position is known.

fields
  • physics.acc-ph4
  • hep-ex1
  • physics.ins-det1
same name
  • C. Jensen — 10 papers, h 8
  • C. Jensen — 6 papers
  • C. Jensen — 1 paper, h 15
  • C. Jensen — 1 paper
  • C. Jensen — 1 paper
  • C. Jensen — 1 paper

Either other researchers who publish under this name, or the same person where the external sources have not merged their records.

identity via Semantic Scholar / OpenAlex

activity
20022021
most citedRF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

5 citations · 11 across the 3 of their papers we have counts for

collaborators
Showing physics.acc-phShow all

4 papers · 1 filter

physics.acc-ph2018

High Burst Rate Charging System for the Lithium Lens Power Supply

H. Pfeffer, D. Frolov, C. C. Jensen +2

Two pulsed power systems have been upgraded for the g-2 experiment at Fermilab. The Pbar Lithium Lens supply previously ran with a half sine pulsed current of 75 kA peak, 400 us du…

physics.acc-ph2015★ 3 cited

Third generation residual gas ionization profile monitors at Fermilab

J. R. Zagel, M. Alvarez, B. Fellenz +6

The latest generation of IPMs installed in the Fermilab Main Injector and Recycler incorporate a 1 kG permanent magnet, a newly designed high-gain, rad-tolerant preamp, and a contr…

physics.acc-ph2012★ 5 cited

RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

E. Harms, K. Carlson, B. Chase +22

Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the…

physics.acc-ph2012★ 3 cited

A gap clearing kicker for Main Injector

I. Kourbanis, P. Adamson, J. Biggs +10

Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power l…

◍wovepaper

Papers, researchers and institutions, woven together.

Explore
  • Search
  • Researchers
  • Institutions
Account
  • Library
  • Chat
Data
  • arXiv.org
  • Semantic Scholar
  • OpenAlex
  • Latest RSS
AboutContactPrivacyDevelopersllms.txtopenapi.json
Not affiliated with arXiv. Researcher data from Semantic Scholar (ODC-BY) and OpenAlex.