collaborators

5 papers

astro-ph.EP2026

The PLATO field selection process III. Selection of the Prime Sample for the LOPS2 field

V. Nascimbeni, G. Piotto, V. Granata +30

The PLanetary Transits and Oscillations of stars (PLATO) mission will begin its four-year nominal mission in early 2027 by monitoring its Long-duration Observation Phase field at S…

astro-ph.EP2026

Assessment of PLATO Science Performance

Juan Cabrera, Heike Rauer, Reza Samadi +121

The PLATO mission is scheduled for launch early 2027. In this paper we present an overview of the performance drivers for the mission at the time where all flight models of the cam…

astro-ph.SR2026

The PLATO Science Calibration and Validation Plan: Targets for the First Long-pointing Field

Konstanze Zwintz, Conny Aerts, Andrew Tkachenko +56

In order to meet the science goals of the PLATO space mission, an extensive science calibration and validation plan has been designed. This paper describes this plan, as well as th…

astro-ph.EP2026

The PLATO Input Catalogue of targets (tPIC) for the first Long Pointing Field

M. Montalto, G. Piotto, P. M. Marrese +30

The ESA PLAnetary Transits and Oscillations of stars (PLATO) mission is designed to detect terrestrial planets in the habitable zones of solar-type stars. Owing to telemetry constr…

astro-ph.IM2026

PLATO input catalogs for technical calibration and fine guidance

René Heller, Chen Jiang, Paz Bluhm +18

A few weeks after launch, the PLATO spacecraft is expected to start its payload commissioning, which will be completed within the first three months of the mission. This phase incl…