most citedHow Periodic Forecast Updates Influence MRP Planning Parameters: A Simulation Study

2 citations · 6 across the 6 of their papers we have counts for

collaborators

6 papers

eess.SY2025★ 2 cited

Release Date Optimization in MRP Using Clearing Functions

Wolfgang Seiringer, Klaus Altendorfer, Reha Uzsoy

This paper integrates a clearing function (CF)-based release planning approach into Material Requirements Planning (MRP) to address its limitations in modeling capacity constraints…

econ.GN2024

Energy Price and Workload Related Dispatching Rule: Balancing Energy and Production Logistics Costs

Balwin Bokor, Wolfgang Seiringer, Klaus Altendorfer +1

In response to the escalating need for sustainable manufacturing practices amid fluctuating energy prices, this study introduces a novel dispatching rule that integrates energy pri…

econ.GN2024

Evaluating Production Planning and Control Systems in Different Environments: A Comparative Simulation Study

Wolfgang Seiringer, Balwin Bokor, Klaus Altendorfer

Selecting the appropriate production planning and control systems (PPCS) presents a significant challenge for many companies, as their performance, i.e., overall costs, depends on…

econ.GN2024★ 2 cited

How Periodic Forecast Updates Influence MRP Planning Parameters: A Simulation Study

Wolfgang Seiringer, Klaus Altendorfer, Thomas Felberbauer +2

In many supply chains, the current efforts at digitalization have led to improved information exchanges between manufacturers and their customers. Specifically, demand forecasts ar…

eess.SY2024

Integrating Simulation Budget Management into Drum-Buffer-Rope: A Study on Parametrization and Reducing Computational Effort

Balwin Bokor, Wolfgang Seiringer, Klaus Altendorfer

In manufacturing, a bottleneck workstation frequently emerges, complicating production planning and escalating costs. To address this, Drum-Buffer-Rope (DBR) is a widely recognized…

econ.EM2024★ 2 cited

Enhancing Rolling Horizon Production Planning Through Stochastic Optimization Evaluated by Means of Simulation

Manuel Schlenkrich, Wolfgang Seiringer, Klaus Altendorfer +1

Production planning must account for uncertainty in a production system, arising from fluctuating demand forecasts and execution-level friction. This article integrates scenario-ba…