activity
20092020
most citedPresent status and first results of the final focus beam line at the KEK Accelerator Test Facility

30 citations · 38 across the 3 of their papers we have counts for

collaborators

5 papers

physics.acc-ph2020

A sub-micron resolution, bunch-by-bunch beam trajectory feedback system and its application to reducing wakefield effects in single-pass beamlines

D. R. Bett, P. N. Burrows, C. Perry +4

A high-precision intra-bunch-train beam orbit feedback correction system has been developed and tested in the ATF2 beamline of the Accelerator Test Facility at the High Energy Acce…

physics.acc-ph20188 cited

Design and operation of a prototype interaction point beam collision feedback system for the International Linear Collider

R. J. Apsimon, D. R. Bett, N. Blaskovic Kraljevic +8

A high-resolution, intratrain position feedback system has been developed to achieve and maintain collisions at the proposed future electron-positron International Linear Collider…

physics.acc-ph2018

Stabilization of the arrival time of a relativistic electron beam to the 50 fs level

J. Roberts, P. Skowronski, P. N. Burrows +5

We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Li…

physics.acc-ph201230 cited

Present status and first results of the final focus beam line at the KEK Accelerator Test Facility

P. Bambade, M. Alabau Pons, J. Amann +91

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam…

physics.acc-ph2009

Latest Beam Test Results of the FONT4 ILC Intra-train Feedback System Prototype

P. N. Burrows, R. Apsimon, G. B. Christian +8

We present the design and preliminary results of a prototype beam-based digital feedback system for the Interaction Point of the International Linear Collider. A custom analogue fr…