30 citations · 47 across the 8 of their papers we have counts for
8 papers
Progress of Diamond Digital Low Level RF
P Gu, C. Christou, P. Hamadyk +3
The first version of digital low level RF (DLLRF) for the Diamond Light Source storage ring and booster was developed with ALBA Synchrotron. Six systems have been built so far. Two…
A high-resolution, low-latency, bunch-by-bunch feedback system for nano-beam stabilization
D. R. Bett, N. Blaskovic Kraljevic, T. Bromwich +4
We report the design, operation and performance of a high-resolution, low-latency, bunch-by-bunch feedback system for nano-beam stabilisation. The system employs novel, ultra-low q…
Design and operation of a prototype interaction point beam collision feedback system for the International Linear Collider
R. J. Apsimon, D. R. Bett, N. Blaskovic Kraljevic +8
A high-resolution, intratrain position feedback system has been developed to achieve and maintain collisions at the proposed future electron-positron International Linear Collider…
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
J. Roberts, P. Skowronski, P. N. Burrows +5
We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Li…
Present status and first results of the final focus beam line at the KEK Accelerator Test Facility
P. Bambade, M. Alabau Pons, J. Amann +91
ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam…
Pulse-to-pulse Orbit Jitter Propagation in Multi-bunch Operation at the KEK Accelerator Test Facility 2 (ATF2)
Javier Resta-Lopez, Glenn Christian
Pulse-to-pulse orbit jitter, if not controlled, can drastically degrade the luminosity in future linear colliders. The second goal of the ATF2 project at the KEK accelerator test f…