2 papers
cs.CV2026
Robust Reconstruction of Power Lines from Incomplete Mobile and Aerial LiDAR Data
Mohamed Gaha, Damos Ayobo Abongo, Philippe Massicotte +4
Accurate vegetation-encroachment assessment and risk mitigation require electric utilities to accurately locate and characterize distribution-network assets, including poles and po…
cs.NI2025
Optimizing Resource Allocation and Scheduling towards FRMCS and GSM-R networks coexistence in Railway Systems
Mohamed Aziz Aboud, Nawel Zangar, Rami Langar +2
The actual railway communication system used in Europe for high-speed trains (HST) is called the GSM-R system, which is a communication system based on 2G infrastructure. This syst…