activity
20122025
most citedDesign and Construction of the MicroBooNE Detector

429 citations · 732 across the 5 of their papers we have counts for

collaborators

6 papers

hep-ex2025

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab

F. Abd Alrahman, P. Abratenko, N. Abrego-Martinez +194

This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, USA. The ICARUS T6…

physics.ins-det2025

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Frederick Schwartz, Roberto Acciarri, Johan Bremer +9

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi Nati…

hep-ex2023★ 1 cited

ICARUS at the Fermilab Short-Baseline Neutrino Program -- Initial Operation

ICARUS Collaboration

The ICARUS collaboration employed the 760-ton T600 detector in a successful three-year physics run at the underground LNGS laboratory studying neutrino oscillations with the CERN N…

physics.ins-det2017★ 429 cited

Design and Construction of the MicroBooNE Detector

MicroBooNE Collaboration, R. Acciarri, C. Adams +237

This paper describes the design and construction of the MicroBooNE liquid argon time projection chamber and associated systems. MicroBooNE is the first phase of the Short Baseline…

physics.ins-det2015★ 302 cited

A Proposal for a Three Detector Short-Baseline Neutrino Oscillation Program in the Fermilab Booster Neutrino Beam

R. Acciarri, C. Adams, R. An +221

A Short-Baseline Neutrino (SBN) physics program of three LAr-TPC detectors located along the Booster Neutrino Beam (BNB) at Fermilab is presented. This new SBN Program will deliver…

physics.acc-ph2012

Commissioning report of the MuCool 5 Tesla solenoid coupled with helium refrigerator

Michael Geynisman

This report describes results of the commissioning of the MuCool refrigeration system coupled with superconducting 5T solenoid. The commissioning was done from March 4 through Apri…