activity
20242026
collaborators

5 papers

eess.SY2026

Ramping Procurement and Bid-Cost Recovery in Real-Time Market

Cong Chen, Valentina Norambuena, Lang Tong

We study ramping procurement co-optimized with economic dispatch under net-demand uncertainty. We examine two flexible ramp product designs implemented by grid operators: single-in…

eess.SY2026

Renewable-Colocated Green Hydrogen Production: Optimal Scheduling and Profitability

Siying Li, Lang Tong, Timothy Mount +3

We study the optimal green hydrogen production and energy market participation of a renewable-colocated hydrogen producer (RCHP) that utilizes onsite renewable generation for both…

eess.SY2026

Risk-Based Capacity Accreditation of Resource-Colocated Large Loads in Capacity Markets

Siying Li, Lang Tong, Timothy D. Mount

We study capacity accreditation of resource-colocated large loads, defined as large demands such as data center and manufacturing loads colocated with behind-the-meter generation a…

math.OC2025

Energy Management for Renewable-Colocated Artificial Intelligence Data Centers

Siying Li, Lang Tong, Timothy D. Mount

We develop an energy management system (EMS) for artificial intelligence (AI) data centers with colocated renewable generation. Under a cost-minimizing framework, the EMS of renewa…

eess.SY2024

Decentralized Equitable Energy Access in Energy Communities

Siying Li, Timothy Douglas Mount, Lang Tong

We address the issue of equitable energy access within an energy community consisting of members with diverse socioeconomic backgrounds, including varying income levels and differi…