2k citations · 4.4k across the 11 of their papers we have counts for
Showing physics.acc-phShow all
2 papers · 1 filter
physics.acc-ph2022★ 1 cited
Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac
Kazuro Furukawa, Mitsuo Akemoto, Dai Arakawa +39
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects,…
physics.acc-ph2000★ 7 cited
Beam Switching and Beam Feedback Systems at KEKB Linac
K. Furukawa, A. Enomoto, N. Kamikubota +6
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among…