A Bi-Objective Mathematical Model for the Multi-Skilled Resource-Constrained Project Scheduling Problem Considering Reliability: An AUGMECON2VIKOR Hybrid Method
Mohammad Ghasemi, Asef Nazari, Dhananjay Thiruvady +3
In recent years, resources with multiple skills have received attention as an extension of the resource-constrained project scheduling problem known as MSRCPSP. Although the disrup…
A matheuristic approach for an integrated lot-sizing and scheduling problem with a period-based learning effect
Mohammad Rohaninejad, Behdin Vahedi-Nouri, Reza Tavakkoli-Moghaddam +1
This research investigates a multi-product capacitated lot-sizing and scheduling problem incorporating a novel learning effect, namely the period-based learning effect. This is ins…
A Flexible Job Shop Scheduling Problem Involving Reconfigurable Machine Tools Under Industry 5.0
Hessam Bakhshi-Khaniki, Reza Tavakkoli-Moghaddam, Zdenek Hanzalek +1
The rise of Industry 5.0 has introduced new demands for manufacturing companies, requiring a shift in how production schedules are managed to address human centered, environmental,…
Optimizing Perishable and Non-Perishable Product Assignment to Packaging Lines in a Sustainable Manufacturing System: An AUGMECON2VIKOR Algorithm
Reza Shahabi-Shahmiri, Reza Tavakkoli-Moghaddam, Zdenek Hanzalek +3
Identifying appropriate manufacturing systems for products can be considered a pivotal manufacturing task contributing to the optimization of operational and planning activities. I…