Inference as Flexibility: Ramp Management for Transmission-Connected AI Data Centres

Zhirui Liang

The rapid growth of large AI data centres introduces new operational challenges for power systems, including rapid ramping, oscillatory load behavior, voltage fluctuations, and sup…

cs.LG2026

OpenG2G: A Simulation Platform for AI Datacenter-Grid Runtime Coordination

Jae-Won Chung, Zhirui Liang, Yanyong Mao +3

AI's growing compute demand and new datacenter buildouts present major capacity and reliability challenges for the electricity grid, leading to multi-year interconnection delays fo…

eess.SY2026

GPU-to-Grid: Voltage Regulation via GPU Utilization Control

Zhirui Liang, Jae-Won Chung, Mosharaf Chowdhury +2

While the rapid expansion of data centers poses challenges for power grids, it also offers new opportunities as flexible loads. Existing power system research often abstracts data…

eess.SY2025

Electricity Market-Clearing With Extreme Events

Tomas Tapia, Zhirui Liang, Charalambos Konstantinou +1

Extreme events jeopardize power network operations, causing beyond-design failures and massive supply interruptions. Existing market designs fail to internalize and systematically…

eess.SY2024

Prescribing Decision Conservativeness in Two-Stage Power Markets: A Distributionally Robust End-to-End Approach

Zhirui Liang, Qi Li, Anqi Liu +1

This paper presents an end-to-end framework for calibrating wind power forecast models to minimize operational costs in two-stage power markets, where the first stage involves a di…