4 papers · 1 filter
Heat load measurements for the PIP-II pHB650 cryomodule
D. Porwisiak, M. J. White, V. Roger +11
Phase-3 testing of the pHB650 cryomodule at the PIP-II Injector Test Facility was conducted to evaluate the effectiveness of heat load mitigations performed after earlier phases of…
Integration and commissioning plan of Full Flow Purifier at Muon Campus
J. Subedi, T. Tope, B. Hansen +5
The Full Flow Purifier for Fermilab's Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineeri…
Performance of PIP-II High-beta 650 Cryomodule After Transatlantic Shipping
J. Ozelis, M. Barba, J. Bernardini +27
After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may hav…
Installation, commissioning, and testing of the HB650 CM at PIP2IT
M White, J Makara, S Ranpariya +10
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LI…