2 papers
eess.SY2024
A New Method For Flushing of Subsea Production Systems Prior to Decommissioning or Component Disconnection
Lucas Cantinelli Sevillano, Milan Stanko, Sigbjoern Sangesland
This paper outlines a novel subsea flushing system which uses a subsea tool to improve the performance of the flushing operation. The new method outlined in this paper uses a small…
cs.CE2024
A method to estimate well flowing gas-oil ratio and composition using pressure and temperature measurements across a production choke, a seed composition of oil and gas, and a thermodynamic simulator
Seok Ki Moon, Milan Stanko
In this work we propose and demonstrate a method to estimate the flowing gas-oil ratio and composition of a hydrocarbon well stream using measurements of pressure and temperature a…