11 citations · 11 across the 3 of their papers we have counts for
Showing physics.acc-phShow all
2 papers · 1 filter
physics.acc-ph2024
Post-irradiation examination of a prototype tantalum-clad target for the Beam Dump Facility at CERN
Tina Griesemer, Rui Franqueira Ximenes, Gonzalo Arnau Izquierdo +13
The Beam Dump Facility (BDF) is a planned fixed-target installation in CERN's North Area, set to start operating in 2031. A proton beam of 400 GeV/c will be delivered in 1 s pulses…
physics.acc-ph2022★ 11 cited
A Metallurgical Inspection Method to Assess the Damage in Performance-Limiting Nb3Sn Accelerator Magnet Coils
Alice Moros, Mickael Denis Crouvizier, Ignacio Aviles Santillana +12
The design and production of Nb3Sn-based dipole and quadrupole magnets is critical for the realization of the High-Luminosity Large Hadron Collider (HL-LHC) at the European Organiz…