3 citations · 4 across the 6 of their papers we have counts for
6 papers
Physics Opportunities at a Beam Dump Facility at PIP-II at Fermilab and Beyond
A. A. Aguilar-Arevalo, J. L. Barrow, C. Bhat +45
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experimen…
Electron Cloud Measurements in Fermilab Booster
S. A. K. Wijethunga, N. Eddy, J. Eldred +4
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilab's Proton Improvement Plan-II (PIP-II). One of the facto…
Electron Cloud Measurements in Fermilab Booster
S. A. K. Wijethunga, J. Eldred, C. Y. Tan +1
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factor…
Physics Opportunities for the Fermilab Booster Replacement
John Arrington, Joshua Barrow, Brian Batell +49
This white paper presents opportunities afforded by the Fermilab Booster Replacement and its various options. Its goal is to inform the design process of the Booster Replacement ab…
SBN-BD: (10 GeV) Proton Beam Dump at Fermilab's PIP-II Linac
Matt Toups, R. G. Van de Water, Brian Batell +15
Proton beam dumps are prolific sources of mesons enabling a powerful technique to search for vector mediator coupling of dark matter to neutral pion and higher mass meson decays. B…
PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac
M. Toups, R. G. Van de Water, Brian Batell +27
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-w…