40 citations · 40 across the 4 of their papers we have counts for
4 papers
Exploring diffusion bonding of niobium and its alloys with tungsten and a molybdenum alloy for high-energy particle target applications
Tina Griesemer, Rui Franqueira Ximenes, Claudia Ahdida +16
Particle-producing targets in high-energy research facilities are often made from refractory metals, and they typically require dedicated cooling systems due to the challenging the…
Post-irradiation examination of a prototype tantalum-clad target for the Beam Dump Facility at CERN
Tina Griesemer, Rui Franqueira Ximenes, Gonzalo Arnau Izquierdo +13
The Beam Dump Facility (BDF) is a planned fixed-target installation in CERN's North Area, set to start operating in 2031. A proton beam of 400 GeV/c will be delivered in 1 s pulses…
Study of alternative locations for the SPS Beam Dump Facility
Oliver Aberle, Claudia Ahdida, Pablo Arrutia +26
As part of the main focus of the BDF Working Group in 2021, this document reports on the study of alternative locations and possible optimisation that may accompany the reuse of ex…
Design of the third-generation lead-based neutron spallation target for the neutron time-of-flight facility at CERN
Raffaele Esposito, Marco Calviani, Oliver Aberle +20
The neutron time-of-flight (n_TOF) facility at the European Laboratory for Particle Physics (CERN) is a pulsed white-spectrum neutron spallation source producing neutrons for two e…