activity
19972022
most citedOperational experience, improvements, and performance of the CDF Run II silicon vertex detector

33 citations · 167 across the 16 of their papers we have counts for

collaborators

16 papers

hep-ex2022★ 3 cited

DarkQuest: A dark sector upgrade to SpinQuest at the 120 GeV Fermilab Main Injector

Aram Apyan, Brian Batell, Asher Berlin +36

Expanding the mass range and techniques by which we search for dark matter is an important part of the worldwide particle physics program. Accelerator-based searches for dark matte…

physics.ins-det2020★ 2 cited

A study of radiation tolerance in optical cements

R. J. Tesarek, E. Hahn, A. Pla-Dalmau +1

We study the effect ionizing radiation has on light transmission in the wavelength range 190--1100~nm for a number of optically clear epoxies. We find that the transmittance of tra…

physics.acc-ph2019★ 2 cited

Foil Scattering Model for Fermilab Booster

J. Eldred, C. M. Bhat, S. Chaurize +5

At the Fermilab Booster, and many other proton facili-ties, an intense proton beam is accumulated by multi-turn injection of an H- beam through a stripping foil. The circu-lating b…

physics.ins-det2018★ 1 cited

The NOvA Power Distribution System

E. C. Dukes, R. Ehrlich, S. Goadhouse +3

We describe the power distribution systems and grounding schemes built for the near and far detectors of the NOvA long-baseline neutrino experiment. They are used to power the aval…

physics.acc-ph2015★ 2 cited

Beam studies for the Proton Improvement Plan (PIP) -- reducing beam loss at the Fermilab Booster

K. Seiya, C. M. Bhat, D. E. Johnson +4

The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of protons per hour. The intensity per cycle wil…

physics.ins-det2013★ 33 cited

Operational experience, improvements, and performance of the CDF Run II silicon vertex detector

T. Aaltonen, S. Behari, A. Boveia +57

The Collider Detector at Fermilab (CDF) pursues a broad physics program at Fermilab's Tevatron collider. Between Run II commissioning in early 2001 and the end of operations in Sep…