activity
20192026
most citedCost Analysis of Nondeterministic Probabilistic Programs

3 citations · 4 across the 6 of their papers we have counts for

collaborators

6 papers

eess.SY2026

Quantitative Verification of Constrained Occupation Time for Stochastic Discrete-time Systems

Bai Xue, Peixin Wang, C. -H. Luke Ong

This paper addresses the quantitative verification of constrained occupation time in stochastic discrete-time systems, focusing on the probability of visiting a target set at least…

cs.FL2025

Structural Abstraction and Refinement for Probabilistic Programs

Guanyan Li, Juanen Li, Zhilei Han +3

In this paper, we present structural abstraction refinement, a novel framework for verifying the threshold problem of probabilistic programs. Our approach represents the structure…

cs.PL2023★ 1 cited

Static Posterior Inference of Bayesian Probabilistic Programming via Polynomial Solving

Peixin Wang, Tengshun Yang, Hongfei Fu +2

In Bayesian probabilistic programming, a central problem is to estimate the normalised posterior distribution (NPD) of a probabilistic program with conditioning via score (a.k.a. o…

cs.LG2022

Taming Reachability Analysis of DNN-Controlled Systems via Abstraction-Based Training

Jiaxu Tian, Dapeng Zhi, Si Liu +3

The intrinsic complexity of deep neural networks (DNNs) makes it challenging to verify not only the networks themselves but also the hosting DNN-controlled systems. Reachability an…

cs.PL2019★ 3 cited

Cost Analysis of Nondeterministic Probabilistic Programs

Peixin Wang, Hongfei Fu, Amir Kafshdar Goharshady +3

We consider the problem of expected cost analysis over nondeterministic probabilistic programs, which aims at automated methods for analyzing the resource-usage of such programs. P…

cs.PL2019

Proving Expected Sensitivity of Probabilistic Programs with Randomized Variable-Dependent Termination Time

Peixin Wang, Hongfei Fu, Krishnendu Chatterjee +2

The notion of program sensitivity (aka Lipschitz continuity) specifies that changes in the program input result in proportional changes to the program output. For probabilistic pro…