30 citations · 35 across the 3 of their papers we have counts for
Showing 2023Show all
2 papers · 1 filter
physics.plasm-ph2023
A strategy to identify breakdown location in MITICA test facility: results of high voltage test campaign
Loris Zanotto, Marco Boldrin, Giuseppe Chitarin +7
The Acceleration Grid Power Supply of the MITICA test facility in Padova (Italy) is currently under commissioning. The power conversion system, the DC generator, and the High Volta…
physics.plasm-ph2023★ 30 cited
Lessons learned after three years of SPIDER operation and the first MITICA integrated tests
D. Marcuzzi, V. Toigo, M. Boldrin +139
ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power…