activity
20092021
most citedThe prototyping/early construction phase of the BAIKAL-GVD project

67 citations · 170 across the 15 of their papers we have counts for

collaborators
Showing astro-ph.IMShow all

5 papers · 1 filter

astro-ph.IM2021★ 7 cited

Search for Astrophysical Nanosecond Optical Transients with TAIGA-HiSCORE Array

A. D. Panov, I. I. Astapov, A. K. Awad +81

A wide-angle Cerenkov array TAIGA-HiSCORE (FOV 0.6 sr), was originally created as a part of TAIGA installation for high-energy gamma-ray astronomy and cosmic ray physics. Arr…

astro-ph.IM2019★ 4 cited

A positioning system for Baikal-GVD

GVD Collaboration, A. D. Avrorin, A. V. Avrorin +50

A cubic kilometer scale neutrino telescope Baikal-GVD is currently under construction in Lake Baikal. Baikal-GVD is designed to detect Cerenkov radiation from products of astrophys…

astro-ph.IM2019★ 5 cited

The Baikal-GVD detector calibration

GVD Collaboration, A. D. Avrorin, A. V. Avrorin +50

In April 2019, the Baikal-GVD collaboration finished the installation of the fourth and fifth clusters of the neutrino telescope Baikal-GVD. Momentarily, 1440 Optical Modules (OM)…

astro-ph.IM2018★ 4 cited

Baikal-GVD: status and prospects

GVD Collaboration, A. D. Avrorin, A. V. Avrorin +49

Baikal-GVD is a next generation, kilometer-scale neutrino telescope under construction in Lake Baikal. It is designed to detect astrophysical neutrino fluxes at energies from a few…

astro-ph.IM2013★ 67 cited

The prototyping/early construction phase of the BAIKAL-GVD project

A. D. Avrorin, A. V. Avrorin, V. M. Aynutdinov +49

The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of a three string engineering array which comprises all basic elements and system…