19 citations · 61 across the 8 of their papers we have counts for
Showing 2016Show all
3 papers · 1 filter
physics.ins-det2016★ 1 cited
Monte-Carlo study of the MRPC prototype for the upgrade of BESIII
F. F. An, S. S. Sun, H. M. Liu +5
A GEANT4-based simulation is developed for the endcap time of flight (ETOF) upgrade based on multi-gap resistive plate chambers (MRPC) for the BESIII experiment. The MRPC prototype…
physics.ins-det2016★ 10 cited
First results of the new endcap TOF commissioning at BESIII
Zhi Wu, Shengsen Sun, Yuekun Heng +23
The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished…
physics.ins-det2016★ 19 cited
The upgrade system of BESIII ETOF with MRPC technology
Xiaozhuang Wang, Yongjie Sun, Cheng Li +14
The Beijing Spectrometer III (BESIII) endcap Time-Of-Filght (ETOF) was proposed to upgrade with Multigap Resistive Plate Chamber (MRPC) technology to substitute the current ETOF of…