10 citations · 18 across the 3 of their papers we have counts for
4 papers
Belle II Technical Design Report
T. Abe, I. Adachi, K. Adamczyk +407
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under constructi…
Compensation of the Crossing Angle with Crab Cavities at KEKB
T. Abe, K. Akai, M. Akemoto +112
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab cr…
Development of Superconducting Linac for the Kek/Jaeri Joint Project
M. Mizumoto, N. Ouchi, J. Kusano +13
The JAERI/KEK Joint Project for the high-intensity proton accelerator facility has been proposed with a superconducting (SC) linac option from 400 MeV to 600MeV. System design of t…
The RF source of the 60-MeV Linac for the KEK/JAERI Joint Project
S. Fukuda, A. Anami, C. Kubota +6
The construction of the 60-MeV proton linac has started as a low-energy front of the KEK/JAERI Joint Project for a high-intensity proton accelerator facility at KEK. The accelerati…