most citedA common approximation framework for the early work, the late work, and resource leveling problems with unit time jobs

20 citations · 25 across the 6 of their papers we have counts for

collaborators

6 papers

math.OC2024★ 2 cited

A cost function approximation method for dynamic vehicle routing with docking and LIFO constraints

Markó Horváth, Tamás Kis, Péter Györgyi

In this paper, we study a dynamic pickup and delivery problem with docking constraints. There is a homogeneous fleet of vehicles to serve pickup-and-delivery requests at given loca…

cs.DS2022★ 1 cited

An online joint replenishment problem combined with single machine scheduling

Péter Györgyi, Tamás Kis, Tímea Tamási

This paper considers a combination of the joint replenishment problem with single machine scheduling. There is a single resource, which is required by all the jobs, and a job can b…

math.OC2022★ 1 cited

Approximation algorithms for coupled task scheduling minimizing the sum of completion times

David Fischer, Péter Györgyi

In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We…

cs.GT2021

A Multivariate Complexity Analysis of the Material Consumption Scheduling Problem

Matthias Bentert, Robert Bredereck, Péter Györgyi +2

The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing…

math.OC2020★ 1 cited

New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints

Péter Györgyi, Tamás Kis

In this paper we consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy,…

cs.DS2019★ 20 cited

A common approximation framework for the early work, the late work, and resource leveling problems with unit time jobs

Peter Gyorgyi, Tamas Kis