◍wovepaper
SearchResearchersInstitutions
Sign in
researcher

Chetan Gupta

22 papers hereh-index 161.3k citations49 works total

Matching runs newest-first, so older work may not be attached to this profile yet.

author position
  • middle author9
  • last author13

Across the 22 of 22 papers where every author was matched, so the position is known.

fields
  • cs.LG19
  • cs.CL1
  • cs.CV1
  • eess.SY1
same name
  • Chetan Gupta — 9 papers, h 6
  • Chetan Gupta — 6 papers, h 3
  • Chetan Gupta — 4 papers, h 2
  • Chetan Gupta — 2 papers, h 2

Either other researchers who publish under this name, or the same person where the external sources have not merged their records.

identity via Semantic Scholar / OpenAlex

activity
20182023
most citedRemaining Useful Life Estimation Using Functional Data Analysis

19 citations · 109 across the 21 of their papers we have counts for

collaborators
Showing 2019 · cs.LGShow all

4 papers · 2 filters

cs.LG2019

Regularized Operating Envelope with Interpretability and Implementability Constraints

Qiyao Wang, Haiyan Wang, Chetan Gupta +1

Operating envelope is an important concept in industrial operations. Accurate identification for operating envelope can be extremely beneficial to stakeholders as it provides a set…

cs.LG2019★ 13 cited

Manufacturing Dispatching using Reinforcement and Transfer Learning

Shuai Zheng, Chetan Gupta, Susumu Serita

Efficient dispatching rule in manufacturing industry is key to ensure product on-time delivery and minimum past-due and inventory cost. Manufacturing, especially in the developed w…

cs.LG2019★ 12 cited

Generative Adversarial Networks for Failure Prediction

Shuai Zheng, Ahmed Farahat, Chetan Gupta

Prognostics and Health Management (PHM) is an emerging engineering discipline which is concerned with the analysis and prediction of equipment health and performance. One of the ke…

cs.LG2019★ 19 cited

Remaining Useful Life Estimation Using Functional Data Analysis

Qiyao Wang, Shuai Zheng, Ahmed Farahat +2

Remaining Useful Life (RUL) of an equipment or one of its components is defined as the time left until the equipment or component reaches its end of useful life. Accurate RUL estim…

◍wovepaper

Papers, researchers and institutions, woven together.

Explore
  • Search
  • Researchers
  • Institutions
Account
  • Library
  • Chat
Data
  • arXiv.org
  • Semantic Scholar
  • OpenAlex
  • Latest RSS
AboutContactPrivacyDevelopersllms.txtopenapi.json
Not affiliated with arXiv. Researcher data from Semantic Scholar (ODC-BY) and OpenAlex.