282 citations · 314 across the 8 of their papers we have counts for
8 papers
Development of next-generation timing system for the Japan Proton Accelerator Research Complex
Fumihiko Tamura, Hiroki Takahashi, Norihiko Kamikubota +2
A precise and stable timing system is necessary for high intensity proton accelerators such as the J-PARC. The original timing system, which was developed during the construction p…
Applications of Triggered Scaler Module for Accelerator Timing
Min Yang, Norihiko Kamikubota, Yuto Tajima +2
Since 2006, there have been unexpected trigger-failure events during the operation of the Japan Proton Accelerator Research Complex (J-PARC) timing system. However, among the many…
Introduction of Modern Subsystems at the KEK Injector-linac
N. Kamikubota, K. Furukawa, S. Kusano +1
As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the K…
A Control System of the Joint-Project Accelerator Complex
J. Chiba, H. Fujii, K. Furukawa +5
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved…
Implementation of the Epics Device Support for Network-Based Controllers
K. Furukawa, J. Chiba, N. Kamikubota +1
In the control system of the JAERI-KEK joint project (High Intensity Proton Accelerator Facility), it is planned to employ network-based controllers such as PLC's and measurement s…
Beam Feedback Systems and BPM Read-out System for the Two-Bunch Acceleration at Kekb Linac
K. Furukawa, N. Kamikubota, T. Suwada +1
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerate…
Stable Operation of a 300-m Laser Interferometer with Sufficient Sensitivity to Detect Gravitational-Wave Events within our Galaxy
Masaki Ando, the TAMA collaboration
TAMA300, an interferometric gravitational-wave detector with 300-m baseline length, has been developed and operated with sufficient sensitivity to detect gravitational-wave events…
Beam Switching and Beam Feedback Systems at KEKB Linac
K. Furukawa, A. Enomoto, N. Kamikubota +6
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among…