most citedMulti-strip observation scheduling problem for ac-tive-imaging agile earth observation satellites

2 citations · 3 across the 5 of their papers we have counts for

collaborators

5 papers

cs.AI2022

Satellite image data downlink scheduling problem with family attribute: Model &Algorithm

Zhongxiang Chang, Zhongbao Zhou

The asynchronous development between the observation capability and the transition capability results in that an original image data (OID) formed by one-time observation cannot be…

cs.AI20222 cited

Multi-strip observation scheduling problem for ac-tive-imaging agile earth observation satellites

Zhongxiang Chang, Abraham P. Punnen, Zhongbao Zhou

Active-imaging agile earth observation satellite (AI-AEOS) is a new generation agile earth observation satellite (AEOS). With renewed capabilities in observation and active im-agin…

cs.AI20221 cited

Three multi-objective memtic algorithms for observation scheduling problem of active-imaging AEOS

Zhongxiang Chang, Zhongbao Zhou

Observation scheduling problem for agile earth observation satellites (OSPFAS) plays a critical role in management of agile earth observation satellites (AEOSs). Active imaging enr…

cs.AI2022

Satellite downlink scheduling under breakpoint resume mode

Zhongxiang Chang, Yuning Chen, Zhongbao Zhou

A novel problem called satellite downlink scheduling problem (SDSP) under breakpoint resume mode (SDSP-BRM) is studied in our paper. Compared to the traditional SDSP where an imagi…

cs.CV2022

An adaptive bi-objective optimization algorithm for the satellite image data downlink scheduling problem considering request split

Zhongxiang Chang, Abraham P. Punnen, Zhongbao Zhou

The satellite image data downlink scheduling problem (SIDSP) is well studied in literature for traditional satellites. With recent developments in satellite technology, SIDSP for m…