17 citations · 32 across the 4 of their papers we have counts for
4 papers · 1 filter
Simulations of Future Particle Accelerators: Issues and Mitigations
D. Sagan, M. Berz, N. M. Cook +15
The ever increasing demands placed upon machine performance have resulted in the need for more comprehensive particle accelerator modeling. Computer simulations are key to the succ…
Polarization and Centre-of-mass Energy Calibration at FCC-ee
Alain Blondel, Patrick Janot, Jörg Wenninger +25
The first stage of the FCC (Future Circular Collider) is a high-luminosity electron-positron collider (FCC-ee) with centre-of-mass energy ranging from 88 to 365 GeV, to study with…
Beam Commissioning Results from the CBETA Fractional Arc Test
C. Gulliford, N. Banerjee, A. Bartnik +18
This work describes first commissioning results from the Cornell Brookhaven Energy Recovery Test Accelerator Fractional Arc Test. These include the recommissioning of the Cornell p…
Beam Position Monitoring System at CESR
M. G. Billing, W. F. Bergan, M. J. Forster +10
The Cornell Electron-positron Storage Ring (CESR) has been converted from a High Energy Physics electron-positron collider to operate as a dedicated synchrotron light source for th…