153 citations · 215 across the 12 of their papers we have counts for
Showing 2023Show all
2 papers · 1 filter
physics.acc-ph2023
Installation, commissioning, and testing of the HB650 CM at PIP2IT
M White, J Makara, S Ranpariya +10
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LI…
physics.acc-ph2023
The Evaluation of Mechanical Properties of LB650 Cavities
J. Holzbauer, G. Wu, H. Park +13
The PIP-II project's LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical prope…