paper

Tevatron Collider Operations and Plans

arXiv:hep-ex/0406013

Abstract

Run II of the Tevatron Collider is reviewed, emphasizing operations through March 15, 2004. The Run II Luminosity Upgrade plans and luminosity projections through 2009 are discussed.

8 pages - including 4 figures and 1 photograph to be published in proceedings of XXXIXth Rencontre de Moriond conference on ElectroWeak Interactions and Unified Theories, La Thuile, Aosta Valley, Italy, March 21-28, 2004