Minimizing makespan in flowshop with time lags
arXiv:cs/0507016
Abstract
We consider the problem of minimizing the makespan in a flowshop involving maximal and minimal time lags. Time lag constraints generalize the classical precedence constraints between operations. We assume that such constraints are only defined between operations of the same job. We propose a solution method and present several extensions.
2 pages. Also available at http://hal.inria.fr/inria-00000149