Internet's Critical Path Horizon
arXiv:cond-mat/0401270 · doi:10.1140/epjb/e2004-00117-x
Abstract
Internet is known to display a highly heterogeneous structure and complex fluctuations in its traffic dynamics. Congestion seems to be an inevitable result of user's behavior coupled to the network dynamics and it effects should be minimized by choosing appropriate routing strategies. But what are the requirements of routing depth in order to optimize the traffic flow? In this paper we analyse the behavior of Internet traffic with a topologically realistic spatial structure as described in a previous study (S-H. Yook et al. ,Proc. Natl Acad. Sci. USA, {\bf 99} (2002) 13382). The model involves self-regulation of packet generation and different levels of routing depth. It is shown that it reproduces the relevant key, statistical features of Internet's traffic. Moreover, we also report the existence of a critical path horizon defining a transition from low-efficient traffic to highly efficient flow. This transition is actually a direct consequence of the web's small world architecture exploited by the routing algorithm. Once routing tables reach the network diameter, the traffic experiences a sudden transition from a low-efficient to a highly-efficient behavior. It is conjectured that routing policies might have spontaneously reached such a compromise in a distributed manner. Internet would thus be operating close to such critical path horizon.
arXiv comment8 pages, 8 figures. To appear in European Journal of Physics B (2004)
Cited by in corpus (13)
- Analyzing and Modeling Real-World Phenomena with Complex Networks: A Survey of Applications
- Dynamics of jamming transitions in complex networks
- Transport on Complex Networks: Flow, Jamming and Optimization
- Information Horizons in Networks
- Traffic dynamics in scale-free networks with limited packet-delivering capacity
- Search in Complex Networks : a New Method of Naming
- Preferential Behaviour and Scaling in Diffusive Dynamics on Networks
- Self-Assembly of Information in Networks
- Discrete surface growth process as a synchronization mechanism for scale free complex networks
- Transmission of packets on a hierarchical network: Statistics and explosive percolation
- Degree Landscapes in Scale-Free Networks
- Jamming of directed traffic on a square lattice
- Networks and Our Limited Information Horizon