Abstract
EMT--RMS benchmarking is widely used to verify cross-platform consistency of inverter-based resource (IBR) dynamic models. This paper examines a 200 MW anonymized IBR represented in PSCAD and PSS/E. The EMT model separates inverter electrical capability from a plant-level power plant controller (PPC) recovery target, whereas the RMS model represents these functions through REECC and REPCA parameters. Directly assigning the PPC target of pu to REPCA hard reactive limits is initialization-inconsistent at the original lagging operating point because the initial reactive command is 0.396273 pu. A second, near-unity-power-factor operating point initializes successfully with the same diagnostic limit, demonstrating that the conflict is operating-point dependent. Using the non-conflicting capability mapping removes the original hard-limit conflict, but the benchmark still shows 18.5--30.2 MVAr post-event POI reactive-power differences from PSCAD. A one-at-a-time REPCA sensitivity under matched benchmark initial conditions further shows that RMS recovery is parameter- and limit-dependent: at and 0.10 the aggregate machine reactive output reaches the configured capability bounds, while moves VDOWN, VUP, and HVRT off those bounds and changes their settled POI reactive power by 8.94, 18.00, and 3.17 MVAr, respectively. Machine-to-POI accounting further shows why machine-side saturation need not reproduce the POI-level PPC recovery magnitude. The results distinguish initialization feasibility from recovery equivalence and provide a control-layer diagnostic workflow beyond waveform comparison.
arXiv commentAccepted for presentation at IEEE PES Grid Edge Technologies 2027, April 19-22, 2027, Salt Lake City, Utah, USA.5 pages, 3 figures, 6 tables