Large-Scale Data Center Integration in Power Systems: Uncertainty and Multi-Scale Variation

arXiv:2610.14264

Abstract

Hyperscale artificial intelligence (AI) data centers are emerging as a structurally new class of electricity demand. Unlike conventional loads, they materialize as spatially concentrated, transmission-level point loads with rapid deployment timelines and converter-dominated dynamics. Their integration is governed by two defining properties: forecast uncertainty in load realization and multi-scale temporal variation spanning sub-seconds to planning horizons. We develop a unified framework that links reliability and affordability to these dimensions through a four-quadrant structure: (reliability, affordability) (uncertainty, variation), which integrates probabilistic resource adequacy, generation and transmission expansion, operational security, and market design. Measured traces from a public generative-AI workload dataset show strongly tonal GPU power spectra rather than smooth broadband behavior: harmonic combs at the training-step cadence, and a distinct sub-second periodicity in inference. Across these traces the dominant variance band shifts with workload type (seconds for training and offline inference; tens of seconds and longer for online inference). We report this as a characterization of the measured workloads rather than a universal signature, and take it to indicate that such loads warrant a spectral description rather than a peak-demand one. These signatures directly affect reserve requirements, ramping products, voltage stability, ride-through performance, and harmonic interactions in converter-rich grids. Taken together, the analytical framework and empirical results establish a system-level basis for assessing the reliability and cost implications of large AI data center integration across planning and operational horizons.

arXiv commentAccepted for publication in Proceedings of the IEEE. Copyright 2026 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses