paper

Production optimization by agents of differing work rates

arXiv:2310.09208

Abstract

We devise a scheme for producing, in the least possible time, identical objects with agents that work at differing speeds. This involves halting the process in order to transfer production across agent types. For the case of two types of agent, we construct a scheme based on the Euclidean algorithm that seeks to minimise the number of pauses in production.

23 pages, 2 figures