Hybrid AC/DC Transmission Expansion Planning Considering HVAC to HVDC Conversion Under Renewable Penetration
arXiv:2310.05828 · doi:10.1109/TPWRS.2020.2988195
Abstract
In this paper, a dynamic (i.e. multi-year) hybrid model is presented for Transmission Expansion Planning (TEP) utilizing the High Voltage Alternating Current (HVAC) and multiterminal Voltage Sourced Converter (VSC)-based High Voltage Direct Current (HVDC) alternatives. In addition to new HVAC and HVDC lines, the possibility of converting existing HVAC transmission lines to HVDC lines is considered in the proposed model. High shares of renewable resources are integrated into the proposed hybrid AC/DC TEP model. Due to the intermittency of renewable resources, the planning of large-scale Energy Storage (ES) devices is considered. In order to accurately estimate the total TEP costs and hence capturing the scenarios of load and renewable generation uncertainty, using a clustering approach, each year of the planning horizon is replaced with four representative days. The proposed model is formulated as a Mixed-Integer Linear Programming (MILP) problem. Using Benders Decomposition (BD) algorithm, the proposed model is decomposed into a Master investment problem to handle the decision variables, and Sub-problems to check the feasibility of master problem solution and optimize the operation and ES investment cost. Three test systems are used as case studies to demonstrate the effectiveness of the proposed hybrid AC/DC TEP model.
Cited by in corpus (5)
- Integrated Expansion Planning of Electric Energy Generation, Transmission, and Storage for Handling High Shares of Wind and Solar Power Generation
- Deep Learning-Based Hurricane Resilient Co-planning of Transmission Lines, Battery Energy Storages and Wind Farms
- Coordinated Expansion Planning of Transmission and Distribution Systems Integrated with Smart Grid Technologies
- Secure Expansion of Energy Storage and Transmission Lines Considering Bundling Option Under Renewable Penetration
- Capturing Chronology and Extreme Values of Representative Days for Planning of Transmission Lines and Long-Term Energy Storage Systems