Switched max-plus linear-dual inequalities for makespan minimization: the case study of an industrial bakery shop

arXiv:2211.07601 · doi:10.1016/j.ifacol.2023.10.038

Abstract

In this paper, an industrial bakery shop is modeled by switched max-plus linear-dual inequalities (SLDIs). SLDIs are timed discrete event systems suitable for describing flow shops with time-window constraints and switching operating modes, where each mode corresponds to a job type. We consider the scheduling problem of minimizing the makespan of the shop, and we show that the application of methods based on the max-plus algebra leads to a faster solution compared to standard techniques. The results of the paper are general, in the sense that they can be applied to any permutation flow shop with time-window constraints.

conference, 3 figures. Some typos in the Appendix and Introduction corrected