disjoint -paths activation in polynomial time
arXiv:2111.04011
Abstract
In activation network design problems we are given an undirected graph and a pair of activation costs for each . The goal is to find an edge set that satisfies a prescribed property of minimum activation cost $τ(F)=\sum_{v \in V} \max \{c_e^v: e \in F \mbox{ is incident to } v\}$. In the Activation Disjoint Paths problem we are given and an integer , and seek an edge set of internally disjoint -paths of minimum activation cost. The problem admits an easy -approximation algorithm. However, it was an open question whether the problem is in P even for and power activation costs, when for all . Here we will answer this question by giving a polynomial time algorithm using linear programing. We will also mention several consequences, among them a polynomial time algorithm for the Activation 2 Edge Disjoint Paths problem, and improved approximation ratios for the Min-Power -Connected Subgraph problem.
The paper has an error - the proof of Lemma 7 is not correct