Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS Phase-2 Muon System Upgrade
arXiv:2111.00304 · doi:10.1088/1748-0221/17/05/C05002
Abstract
The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward region. The GE2/1 triple-Gas Electron Multiplier detector, which has recently entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing process, and the future plans for the frontend electronics of these two detector systems by the CMS GEM Collaboration.
arXiv comment6 pages, 6 figures, submitted to the proceedings of the Topical Workshop on Electronics for Particle Physics (TWEPP2021)