Case study on scheduling cyclic conveyor belts
arXiv:1912.09724
Abstract
We optimise the production line of a manufacturing company in southern Germany in order to improve throughput. While the optimisation problem is NP-hard in general, analysing production data we find that in practice the problem can be solved very efficiently by aggressive generation of random machine schedules.