paper

Case study on scheduling cyclic conveyor belts

arXiv:1912.09724

Abstract

We optimise the production line of a manufacturing company in southern Germany in order to improve throughput. While the optimisation problem is NP-hard in general, analysing production data we find that in practice the problem can be solved very efficiently by aggressive generation of random machine schedules.

Case study on scheduling cyclic conveyor belts · wovepaper