Distilling Critical Paths in Convolutional Neural Networks
arXiv:1811.02643
Abstract
Neural network compression and acceleration are widely demanded currently due to the resource constraints on most deployment targets. In this paper, through analyzing the filter activation, gradients, and visualizing the filters' functionality in convolutional neural networks, we show that the filters in higher layers learn extremely task-specific features, which are exclusive for only a small subset of the overall tasks, or even a single class. Based on such findings, we reveal the critical paths of information flow for different classes. And by their intrinsic property of exclusiveness, we propose a critical path distillation method, which can effectively customize the convolutional neural networks to small ones with much smaller model size and less computation.
Accepted in NIPS18 CDNNRIA workshop
References in corpus (5)
Cited by in corpus (7)
- Understanding Neural Networks and Individual Neuron Importance via Information-Ordered Cumulative Ablation
- Few-shot Object Detection via Feature Reweighting
- FedSkel: Efficient Federated Learning on Heterogeneous Systems with Skeleton Gradients Update
- Task-Adaptive Incremental Learning for Intelligent Edge Devices
- Fed2: Feature-Aligned Federated Learning
- Canoe : A System for Collaborative Learning for Neural Nets
- AntiDote: Attention-based Dynamic Optimization for Neural Network Runtime Efficiency