sCompile: Critical Path Identification and Analysis for Smart Contracts
arXiv:1808.00624
Abstract
Ethereum smart contracts are an innovation built on top of the blockchain technology, which provides a platform for automatically executing contracts in an anonymous, distributed, and trusted way. The problem is magnified by the fact that smart contracts, unlike ordinary programs, cannot be patched easily once deployed. It is important for smart contracts to be checked against potential vulnerabilities. In this work, we propose an alternative approach to automatically identify critical program paths (with multiple function calls including inter-contract function calls) in a smart contract, rank the paths according to their criticalness, discard them if they are infeasible or otherwise present them with user friendly warnings for user inspection. We identify paths which involve monetary transaction as critical paths, and prioritize those which potentially violate important properties. For scalability, symbolic execution techniques are only applied to top ranked critical paths. Our approach has been implemented in a tool called sCompile, which has been applied to 36,099 smart contracts. The experiment results show that sCompile is efficient, i.e., 5 seconds on average for one smart contract. Furthermore, we show that many known vulnerabilities can be captured if user inspects as few as 10 program paths generated by sCompile. Lastly, sCompile discovered 224 unknown vulnerabilities with a false positive rate of 15.4% before user inspection.
arXiv commentAccepted by ICFEM 2019
References in corpus (2)
Cited by in corpus (7)
- Empirical Review of Automated Analysis Tools on 47,587 Ethereum Smart Contracts
- A Survey on Ethereum Systems Security: Vulnerabilities, Attacks and Defenses
- Security Defense For Smart Contracts: A Comprehensive Survey
- An Empirical Study of Blockchain-based Decentralized Applications
- Oracle-Supported Dynamic Exploit Generation for Smart Contracts
- A First Look at Blockchain-based Decentralized Applications
- STAN: Towards Describing Bytecodes of Smart Contract