Time Delay Analysis of the Lensed Quasar SDSS J1001+5027
arXiv:1603.06331 · doi:10.3847/1538-4357/834/1/31
Abstract
We modify the algorithm we proposed before in Aghamousa & Shafieloo (2015) on time delay estimation of the strong lens systems incorporating weighted cross-correlation and weighted summation of correlation coefficients. We show the high performance of this algorithm by applying it on Time Delay Challenge (TDC1) simulated data. We apply then our proposed method on the light curves of the lensed quasar SDSS J1001+5027 since this system has been well studied by other groups to compare our results with their findings. In this work we propose a new estimator namely "mirror" estimator along with a list of criteria for reliability test of estimation. Our mirror estimator results to and using simple Monte Carlo simulations and simulated light curves provided by Rathna Kumar et al. (2013) respectively. Although TDC1 simulations do not reflect the properties of SDSS J1001+5027 light curves, using these simulations results to smaller uncertainty which shows the higher quality observations can lead to substantially more precise time delay estimation. Our time delay estimation is in agreement with findings of the other groups for this strong lens system and the difference in the size of the error bars reflects the importance of appropriate light curve simulations.
arXiv comment19 pages, 5 figures, 1 table, discussions extended, methodology improved, main results unchanged, matches the final version published in ApJ
References in corpus (24)
- Strong Lensing by Galaxies
- Dissecting the Gravitational Lens B1608+656. II. Precision Measurements of the Hubble Constant, Spatial Curvature, and the Dark Energy Equation of State
- Two accurate time-delay distances from strong lensing: Implications for cosmology
- Smoothing Supernova Data to Reconstruct the Expansion History of the Universe and its Age
- What Do Gravitational Lens Time Delays Measure?
- Gravitational Lens Time Delays: A Statistical Assessment of Lens Model Dependences and Implications for the Global Hubble Constant
- Strong Lens Time Delay Challenge: II. Results of TDC1
- COSMOGRAIL: the COSmological MOnitoring of GRAvItational Lenses XIII: Time delays and 9-yr optical monitoring of the lensed quasar RX J1131-1231
- Model independent tests of the standard cosmological model
- Variability of Active Galactic Nuclei
- COSMOGRAIL: the COSmological MOnitoring of GRAvItational Lenses XI. Techniques for time delay measurement in presence of microlensing
- Dissecting the Gravitational Lens B1608+656. I. Lens Potential Reconstruction
- Model Independent Reconstruction of the Expansion History of the Universe and the Properties of Dark Energy
- Lensing Time Delays and Cosmological Complementarity
- Discovery of Two Gravitationally Lensed Quasars with Image Separations of 3 Arcseconds from the Sloan Digital Sky Survey
- Improved Constraints on the Gravitational Lens Q0957+561. II. Strong Lensing
- COSMOGRAIL: the COSmological MOnitoring of GRAvItational Lenses XIV. Time delay of the doubly lensed quasar SDSS J1001+5027
- Strong Lens Time Delay Challenge: I. Experimental Design
- Strong Gravitational Lensing and Dark Energy Complementarity
- Crossing Statistic: Reconstructing the Expansion History of the Universe
- Robust Strong Lensing Time Delay Estimation
- Next Generation Strong Lensing Time Delay Estimation with Gaussian Processes
- Fast and Reliable Time Delay Estimation of Strong Lens Systems Using Method of Smoothing and Cross-Correlation
- Imprints of the quasar structure in time-delay light curves: Microlensing-aided reverberation mapping