Single machine slack due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
arXiv:1405.0712
Abstract
In this paper, we consider the slack due-window assignment model and study a single machine scheduling problem of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. The cost for each job consists of four components: earliness, tardiness, window location and window size. The objective is to schedule the jobs and to assign the maintenance activity and due-windows such that the total cost among all the jobs is minimized. A polynomial-time algorithm with the running time not exceeding to give a solution to this problem is introduced, where is the number of jobs.
Submitted - Under Review