Project X and a muon facility at Fermilab
arXiv:1207.1339 · doi:10.1063/1.3399337
Abstract
An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated approach to the Intensity and Energy Frontiers at Fermilab.
3 pp. 11th International Workshop on Neutrino Factories, Superbeams and Betabeams: NuFact 09. 20-25 Jul 2009. Chicago, Illinois