Project X and a muon facility at Fermilab
arXiv:1207.1339 · doi:10.1063/1.3399337
Abstract
An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated approach to the Intensity and Energy Frontiers at Fermilab.
arXiv comment3 pp. 11th International Workshop on Neutrino Factories, Superbeams and Betabeams: NuFact 09. 20-25 Jul 2009. Chicago, Illinois