Critical paths in a metapopulation model of H1N1: Efficiently delaying influenza spreading through flight cancellation
arXiv:1205.3245 · doi:10.1371/4f8c9a2e1fca8
Abstract
Disease spreading through human travel networks has been a topic of great interest in recent years, as witnessed during outbreaks of influenza A (H1N1) or SARS pandemics. One way to stop spreading over the airline network are travel restrictions for major airports or network hubs based on the total number of passengers of an airport. Here, we test alternative strategies using edge removal, cancelling targeted flight connections rather than restricting traffic for network hubs, for controlling spreading over the airline network. We employ a SEIR metapopulation model that takes into account the population of cities, simulates infection within cities and across the network of the top 500 airports, and tests different flight cancellation methods for limiting the course of infection. The time required to spread an infection globally, as simulated by a stochastic global spreading model was used to rank the candidate control strategies. The model includes both local spreading dynamics at the level of populations and long-range connectivity obtained from real global airline travel data. Simulated spreading in this network showed that spreading infected 37% less individuals after cancelling a quarter of flight connections between cities, as selected by betweenness centrality. The alternative strategy of closing down whole airports causing the same number of cancelled connections only reduced infections by 18%. In conclusion, selecting highly ranked single connections between cities for cancellation was more effective, resulting in fewer individuals infected with influenza, compared to shutting down whole airports. It is also a more efficient strategy, affecting fewer passengers while producing the same reduction in infections. The network of connections between the top 500 airports is available under the resources link on our website http://www.biological-networks.org.
arXiv commentThe network of connections between the top 500 airports is available under the resources link on our website http://www.biological-networks.org. Flight connections for the top 500 airports, based on total passenger volume, worldwide. The existence of flight connections between airports is based on flights within one year from 1 July 2007 to 30 June 2008
References in corpus (16)
- Emergence of scaling in random networks
- Fast unfolding of communities in large networks
- Statistical mechanics of complex networks
- The structure and function of complex networks
- Epidemic spreading in scale-free networks
- Classes of behavior of small-world networks
- Specificity and stability in topology of protein networks
- Characterization of complex networks: A survey of measurements
- Attack vulnerability of complex networks
- The worldwide air transportation network: Anomalous centrality, community structure, and cities' global roles
- Breakdown of the Internet under intentional attack
- Prediction and predictability of global epidemics: the role of the airline transportation network
- Forecast and Control of Epidemics in a Globalized World
- Modeling the Internet's Large-Scale Topology
- Nonoptimal Component Placement, but Short Processing Paths, due to Long-Distance Projections in Neural Systems
- Multiple, weak hits confuse complex systems: A transcriptional regulatory network as an example