Signal delay analysis for binary pulsars
arXiv:0912.0392
Abstract
This note gives a correction to the standard analysis of the delay pattern in the radio signals from a pulsar in a binary system; the same coordinate frame should be used for the transmission of the signal as for the motion of the pulsar in the field of its companion.