213 citations
- Max Planck Institute for Plasma PhysicsDE30 papers
- Culham Science CentreGB26 papers
- CEA CadaracheFR24 papers
- Commissariat à l'Énergie Atomique et aux Énergies AlternativesFR23 papers
- Culham Centre for Fusion EnergyGB19 papers
- École Polytechnique Fédérale de LausanneCH14 papers
- Czech Academy of Sciences, Institute of Plasma PhysicsCZ12 papers
- Eindhoven University of TechnologyNL10 papers
- Princeton Plasma Physics LaboratoryUS10 papers
- General Atomics (United States)US9 papers
- Dutch Institute for Fundamental Energy ResearchNL7 papers
- Institute for the Science and Technology of PlasmasIT7 papers
8 papers · 1 filter
Status of the Beryllium Tile Bonding Qualification activities for the Manufacturing of the ITER First Wall
Raphaël Mitteau, R. Eaton, G. Perez +6
The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliab…
R&D activities on RF contacts for the ITER ion cyclotron resonance heating launcher
Julien Hillairet, Arnaud Argouarch, Rob Bamber +23
Embedded RF contacts are integrated within the ITER ICRH launcher to allow assembling, sliding and to lower the thermo-mechanical stress. They have to withstand a peak RF current u…
Nuclear analysis and shielding optimisation in support of the ITER In-Vessel Viewing System design
A. Turner, R. Pampin, M. J. Loughlin +6
The In-Vessel Viewing System (IVVS) units proposed for ITER are deployed to perform in-vessel examination. During plasma operations, the IVVS is located beyond the vacuum vessel, w…
Plasma cleaning of ITER first mirrors in magnetic field
Lucas Moser, Roland Steiner, Frank Leipold +3
To avoid reflectivity losses in ITER optical diagnostic systems, plasma sputtering of metallic First Mirrors is foreseen in order to remove deposits coming from the main wall (main…
Design of a mechanically actuated RF grounding system for the ITER ICRH antenna
D Hancock, M Shannon, B Beaumont +7
In the ITER equatorial ports containing ICRH antennas, parasitic electrical resonances can be excited in the nominal 20 mm clearance gap between the port walls and the plug contain…
Status of ITER neutral beam cell remote handling system
N Sykes, C Belcher, C-H Choi +9
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. Though manual maintenance work is envisaged within…