Publications (4)
Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection
R. Zwaska, S. Kopp, W. Pellico +1
To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for…
High Gradient Tests of the Fermilab SSR1 Cavity
T. Khabiboulline, C. M. Ginsburg, I. Gonin +12
In Fermilab we are build and tested several superconducting Single Spoke Resonators (SSR1, β=0.22) which can be used for acceleration of low beta ions. Fist two cavities performed…
Status and specifications of a Project X front-end accelerator test facility at Fermilab
J. Steimel, R. Webber, R. Madrak +3
This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development acti…
Operational aspects of the Main Injector large aperture quadrupole (WQB)
W. Chou, L. Bartelson, B. Brown +18
A two-year Large Aperture Quadrupole (WQB) Project was completed in the summer of 2006 at Fermilab. Nine WQBs were designed, fabricated and bench-tested by the Technical Division.…