Publications (4)
Installation status of the electron beam profiler for the Fermilab Main Injector
R. Thurman-Keup, M. Alvarez, J. Fitzgerald +5
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging an…
Commissioning and first results of the Electron Beam Profiler in the Main Injector at Fermilab
R. Thurman-Keup, M. Alvarez, J. Fitzgerald +4
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging an…
Operational aspects of the Main Injector large aperture quadrupole (WQB)
W. Chou, L. Bartelson, B. Brown +18
A two-year Large Aperture Quadrupole (WQB) Project was completed in the summer of 2006 at Fermilab. Nine WQBs were designed, fabricated and bench-tested by the Technical Division.…
Operation of the Intensity Monitors in Beam Transport Lines at Fermilab During Run II
J. Crisp, B. Fellenz, J. Fitzgerald +2
The intensity of charged particle beams at Fermilab must be kept within pre-determined safety and operational envelopes in part by assuring all beam within a few percent has been t…